Every service builds on the last. Most clients start with a plan set and stay through construction — because once you've worked with someone who thinks like a builder, you don't want to go it alone.

Tier 1 — Plan Set

$6,500 - $10,000+

Full construction documents drawn by someone who has actually built the homes they design. Ready for permit submittal and contractor bidding.

✔ Site plan and floor plans
✔ Elevations and sections
✔ Electrical, mechanical, and plumbing layouts
✔ Title 24 energy compliance
✔ Gary’s review and sign-off on all sheets

Permit processing and city revisions billed separately at $200/hr — see Tier 2.

This is a service based on your needs.  Allow me to present a detailed quote.

Tier 2 — Permit Processing

$200/hr

Navigating the city is a job in itself. We handle submittal, respond to corrections, and stay on top of the process so you don’t have to.

✔ Plan submittal to city or county building department
✔ Response to plan check corrections
✔ Coordination with city planners and inspectors
✔ Revision drawings as required by the department

Priced hourly because city revision requirements are genuinely unpredictable — no one can honestly quote this as a flat fee. You’ll get a realistic estimate upfront and regular updates as the process unfolds.Permit processing and city revisions billed separately at $200/hr — see Tier 2.

Tier 3 — Owner's Representative

$10,000–$12,000+

You’re hiring a contractor but don’t speak “contractor.” Gary does. He’ll find the right builder, level the bids, review the contract, and stay in your corner through the entire build.

✔ Prepare bid package from permitted plans
✔ Identify and invite 3 qualified contractors
✔ Level bids line by line — apples to apples
✔ License, insurance, and reference verification
✔ Contract review and red flag identification
✔ Up to 14 site visits during construction
✔ Change order review on items over $5,000
✔ Final punch list walkthrough

On a $1M home this fee is roughly 1% of your construction cost. One prevented dispute or bad change order typically pays for it several times over.

This is a service based on your needs.  Allow me to present a detailed quote.

Tier 4 — Construction Management

7% of total construction cost

For owner-builders or hands-on owners who want a seasoned professional managing the entire project. Gary becomes your builder brain from permit approval through certificate of occupancy.

✔ Contractor and subcontractor hiring
✔ Budget development and cost tracking
✔ Schedule creation and management
✔ Weekly site supervision
✔ All change order negotiation and approval
✔ Inspector coordination and sign-offs
✔ Final walkthrough and punch list

$800K build — approx. $56,000
$1M build — approx. $70,000
$1.4M build — approx. $98,000
A GC marks up subs 20–30%. At 7% you hire direct and I manage everything. This fee pays for itself. over.

Not sure which tier is right for you?

Tell me about your project — what you’re building, where you are in the process, and what’s keeping you up at night. I’ll give you an honest answer about what level of involvement actually makes sense.

Have your plans created by someone who’s built homes,

instead of just thought about building.mischievous8

Scroll to Top